An active Los Feliz project combining an addition, an ADU, a pool and a new kitchen – currently in framing and rough-in. Photos show the scaffolded exterior, structural concrete and rebar, interior arched openings, and the wrapped addition; finished photos to follow at completion.

Two-Story ADU in Silver Lake
A two-story ADU build in Silver Lake, with a kitchenette and full bath, documented from framing and sheathing through the finished interior.






